You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Isn't the valuation rate supposed to be equal to the cost of the raw material plus the cost of service in Subcontracting Receipt in Stock Ledger?
Note
when the item does not have a patch number, valuation rate is given an error
And when he doesn't have a patch number, the result is correct
Please look at the finished product's Valuation Rate on Stock Ledger https://coditem.erpnext.com/app/subcontracting-receipt/MAT-SCR-2023-00001
user:hym201@gmail.com
pass:hym201@43216
Module
stock, manufacturing
Version
ERPNext: v15.2.0 (version-15)
Frappe Framework: v15.1.0 (version-15)
Relevant log output / Stack trace / Full Error Message.
No response
The text was updated successfully, but these errors were encountered:
Information about bug
Isn't the valuation rate supposed to be equal to the cost of the raw material plus the cost of service in Subcontracting Receipt in Stock Ledger?
Note
when the item does not have a patch number, valuation rate is given an error
And when he doesn't have a patch number, the result is correct
Please look at the finished product's Valuation Rate on Stock Ledger
https://coditem.erpnext.com/app/subcontracting-receipt/MAT-SCR-2023-00001
user:hym201@gmail.com
pass:hym201@43216
Module
stock, manufacturing
Version
ERPNext: v15.2.0 (version-15)
Frappe Framework: v15.1.0 (version-15)
Relevant log output / Stack trace / Full Error Message.
No response
The text was updated successfully, but these errors were encountered: