diff --git a/docs/technical_reference/costing/anaerobic_digester.rst b/docs/technical_reference/costing/anaerobic_digester.rst index d302241367..3bac071eb5 100644 --- a/docs/technical_reference/costing/anaerobic_digester.rst +++ b/docs/technical_reference/costing/anaerobic_digester.rst @@ -9,45 +9,34 @@ The following parameters are constructed for the unit on the FlowsheetCostingBlo .. csv-table:: :header: "Description", "Symbol", "Parameter Name", "Default Value", "Units" - "description", ":math:`Symbol_{example}`", "``parameter_name``", "1", ":math:`\text{dimensionless}`" + "Capital cost A parameter :math:`^1`", ":math:`A`", "``capital_a_parameter``", "19.3552312e6", ":math:`\text{USD}_{2012}`" + "Capital cost B parameter :math:`^1`", ":math:`B`", "``capital_b_parameter``", "0.6", ":math:`\text{dimensionless}`" + "Reference flow :math:`^1`", ":math:`F_r`", "``reference_flow``", "911.054", ":math:`m^3/h`" Costing Method Variables ++++++++++++++++++++++++ -The following variables are constructed on the unit block (e.g., m.fs.unit.costing) when applying the `cost_anaerobic_digester` costing method in the ``watertap_costing_package``: - -.. csv-table:: - :header: "Description", "Symbol", "Variable Name", "Index", "Units" - - "description", ":math:`Symbol_{example}`", "``variable_name``", "[t]", ":math:`\text{dimensionless}`" +There are no costing method variables unique to the anaerobic digester. Capital Cost Calculations +++++++++++++++++++++++++ -Describe capital costs..keep it concise where possible - - .. math:: - - C_{cap,tot} = C_{cap,example1}+C_{cap,example2}+C_{cap,other} +Capital cost is dependent upon the unit's volumetric flowrate, :math:`F`, as shown in the equation below. .. math:: - C_{cap,example1} = fill in equation for each component in total capex equation + C_{cap,tot} = A * (F/F_r)^{B} Operating Cost Calculations +++++++++++++++++++++++++++ -Describe operating/maintenance costs..keep it concise where possible +Electricity :math:`C_{elec}` is a variable operating cost based on the energy intensity :math:`E` of the unit process +(electricity consumption for the anaerobic digester), electricity price :math:`P`, electricity flow :math:`Q`, and the plant +utilization factor :math:`f_{util}`. The annual electricity costs are calculated as: .. math:: - - C_{op,tot} = C_{op,example1}+C_{op,example2}+C_{op,other} - - .. math:: - - C_{op,example1} = fill in equation for each component in total opex equation - + C_{op, tot} = C_{elec} = E Q f_{util} P Code Documentation ------------------ @@ -56,4 +45,7 @@ Code Documentation References ---------- -Aim to include at least one reference in most cases, but delete this section if no references used for cost relationships/default values \ No newline at end of file +[1] Eberle, Annika, Irina Tsiryapkina, Steve Peterson, Laura Vimmerstedt, Dylan Hettinger, +and Daniel Inman. 2020. An Overview of the Waste-to-Energy System Simulation +(WESyS) Model. Golden, CO: National Renewable Energy Laboratory. +NREL/TP-6A20-77166. https://www.nrel.gov/docs/fy21osti/77166.pdf. \ No newline at end of file