Skip to content

Commit

Permalink
Merge branch 'develop' into 3044-prometheus-grafana
Browse files Browse the repository at this point in the history
  • Loading branch information
elipe17 authored Sep 19, 2024
2 parents 2d17a47 + 2a5e5c3 commit febf97f
Show file tree
Hide file tree
Showing 2 changed files with 2 additions and 1 deletion.
1 change: 1 addition & 0 deletions .github/ISSUE_TEMPLATE/dev-issue-template.md
Original file line number Diff line number Diff line change
Expand Up @@ -9,6 +9,7 @@ assignees: ''

**Description:**
_Provide a brief background and justification for this issue_
_OFA & UX team: Please include bullets capturing the value to STT end users, related guidance, and/or talking points that should be communicated to STTs in release notes_


**Acceptance Criteria:**
Expand Down
2 changes: 1 addition & 1 deletion docs/How-We-Work/team-meetings.md
Original file line number Diff line number Diff line change
Expand Up @@ -68,12 +68,12 @@ A typical sprint schedule is described in the table below.
- External factors outside of the author spending time building the ticket (ie need external team's input, see how a feature develops, etc.)
- Ex. Waiting on X ticket to finish the scope of said unrefined ticket, problem found / unsure how big it is and knows other work will unearth it
- If we know the ACs but not the tasks, then its unrefined
- Release Notes summary is empty or incomplete as applicable, to be provided by UX/Product by default.
- Refined: Ticket is complete and is ready to be executed.
- Refined & Ready to Go (Next Sprint)
- "Earmarked" work for the upcoming sprint.
- **Labelling:**
- WIP
- Author knows the 5 W's or darn near (90%)
- Drafted ticket – either still on the author the finish their part or a short team conversation is needed.
- Administrative in nature
- Ex. Stub, ticket that doesn't feel there's enough to warrant an introduction
Expand Down

0 comments on commit febf97f

Please sign in to comment.