Skip to content

chore(deps): bump micromatch from 4.0.5 to 4.0.8 #2617

chore(deps): bump micromatch from 4.0.5 to 4.0.8

chore(deps): bump micromatch from 4.0.5 to 4.0.8 #2617

Triggered via pull request August 27, 2024 10:49
Status Failure
Total duration 2m 33s
Artifacts 1

pr_checks.yml

on: pull_request
Matrix: code_style
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (providers/universal-provider)
Process completed with exit code 1.
test (packages/sign-client)
The job was canceled because "providers_universal-provi" failed.
test (packages/sign-client)
Process completed with exit code 1.
test (packages/core)
The job was canceled because "providers_universal-provi" failed.
test (packages/core)
Process completed with exit code 1.
test (providers/ethereum-provider)
The job was canceled because "providers_universal-provi" failed.
test (providers/ethereum-provider)
The operation was canceled.
test (packages/utils)
The job was canceled because "providers_universal-provi" failed.
test (packages/utils)
The operation was canceled.
test (packages/web3wallet)
The job was canceled because "providers_universal-provi" failed.
test (packages/web3wallet)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
build-artifacts Expired
5.65 MB