Skip to content

[DPE-4976] Add workflow for nightly scheduled tests with juju 3.6 #7

[DPE-4976] Add workflow for nightly scheduled tests with juju 3.6

[DPE-4976] Add workflow for nightly scheduled tests with juju 3.6 #7

Re-run triggered August 20, 2024 14:11
Status Success
Total duration 28m 35s
Billable time 7m
Artifacts 57

juju_3_6_ci.yaml

on: pull_request
Build charm  /  Collect bases for charm | .
16s
Build charm / Collect bases for charm | .
Lint  /  Lint .github/workflows/
5s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
16s
Lint / tox run -e lint
Matrix: Build charm / build
Matrix: integration-test-3-6
Fit to window
Zoom out
Zoom in

Annotations

1 warning
Juju 3.6 CI tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.

Artifacts

Produced during runtime
Name Size
logs-integration-test-charm-lxd-juju-3.6-beta-amd64-high_availability-test_async_replication.py-group-1
51.8 KB
logs-integration-test-charm-lxd-juju-3.6-beta-arm64-high_availability-test_async_replication.py-group-1
48.5 KB