chore(deps): bump clap from 4.3.19 to 4.3.23 #26
ci.yml
on: push
nix flake check
18s
nix build
2m 7s
Matrix: cargo build && cargo test
Annotations
6 errors
cargo build && cargo test (stable)
Process completed with exit code 101.
|
cargo build && cargo test (beta)
The job was canceled because "stable" failed.
|
cargo build && cargo test (beta)
The operation was canceled.
|
cargo build && cargo test (nightly)
The job was canceled because "stable" failed.
|
cargo build && cargo test (nightly)
The operation was canceled.
|
nix build
Process completed with exit code 1.
|