Bugs/provider nonce #1613 #4167
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
verify-pr-commit.yml
on: pull_request
Determine Changed Files
55s
Run Benchmarks?
45s
Clear Metadata Mismatch Label
42s
Matrix: build-binaries
Check for Vulnerable Crates
0s
Verify Rust Code Format
0s
Lint Rust Code
0s
Verify Rust Developer Docs
0s
Verify Rust Packages and Dependencies
0s
Run Rust Tests
0s
Calculate Code Coverage
0s
Verify CI Docker Image
0s
Matrix: build-binaries-dummy
Matrix: verify-build-runtimes-dummy
Matrix: verify-build-runtimes
Run Benchmarks
0s
Verify Node Docker Images
0s
Execute Binary Checks
0s
Check Metadata and Spec Version
0s
Verify Genesis State
0s
Run Integration Tests
0s
Annotations
10 errors
Build dev Binary on pr Branch
Canceling since a higher priority waiting request for 'Verify PR Commit-refs/pull/1616/merge' exists
|
Build dev Binary on pr Branch
The operation was canceled.
|
Build rococo Binary on pr Branch
Canceling since a higher priority waiting request for 'Verify PR Commit-refs/pull/1616/merge' exists
|
Build rococo Binary on pr Branch
The operation was canceled.
|
Build local Binary on main Branch
Canceling since a higher priority waiting request for 'Verify PR Commit-refs/pull/1616/merge' exists
|
Build local Binary on main Branch
The operation was canceled.
|
Build local Binary on pr Branch
Canceling since a higher priority waiting request for 'Verify PR Commit-refs/pull/1616/merge' exists
|
Build local Binary on pr Branch
The operation was canceled.
|
Build mainnet Binary on pr Branch
Canceling since a higher priority waiting request for 'Verify PR Commit-refs/pull/1616/merge' exists
|
Build mainnet Binary on pr Branch
The operation was canceled.
|