Skip to content

🩹🚇 Adapt to changed outputs in pyglotaran-examples GHA #901

🩹🚇 Adapt to changed outputs in pyglotaran-examples GHA

🩹🚇 Adapt to changed outputs in pyglotaran-examples GHA #901

Triggered via pull request June 30, 2024 12:23
Status Failure
Total duration 2m 13s
Artifacts

test.yml

on: pull_request
Matrix: Test pyglotaran stable
Test pyglotaran dev
9s
Test pyglotaran dev
Deploy to PyPi
0s
Deploy to PyPi
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Test pyglotaran stable (ubuntu-latest, 3.10)
Process completed with exit code 1.
Test pyglotaran stable (macOS-latest, 3.11)
The job was canceled because "ubuntu-latest_3_10" failed.
Test pyglotaran stable (macOS-latest, 3.11)
Process completed with exit code 1.
Test pyglotaran stable (ubuntu-latest, 3.11)
The job was canceled because "ubuntu-latest_3_10" failed.
Test pyglotaran stable (ubuntu-latest, 3.11)
Process completed with exit code 1.
Test pyglotaran dev
Process completed with exit code 1.
Test pyglotaran stable (macOS-latest, 3.10)
The job was canceled because "ubuntu-latest_3_10" failed.
Test pyglotaran stable (macOS-latest, 3.10)
Process completed with exit code 1.
Test pyglotaran stable (windows-latest, 3.10)
The job was canceled because "ubuntu-latest_3_10" failed.
Test pyglotaran stable (windows-latest, 3.10)
The operation was canceled.
Test pyglotaran stable (windows-latest, 3.11)
The job was canceled because "ubuntu-latest_3_10" failed.
Test pyglotaran stable (windows-latest, 3.11)
The operation was canceled.