Skip to content

chore(deps-dev): bump org.assertj:assertj-core from 2.9.1 to 3.26.0 #20

chore(deps-dev): bump org.assertj:assertj-core from 2.9.1 to 3.26.0

chore(deps-dev): bump org.assertj:assertj-core from 2.9.1 to 3.26.0 #20

Status Failure
Total duration 1m 40s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

14 errors
build (ubuntu-latest, 7)
Process completed with exit code 1.
build (windows-latest, 19)
The job was canceled because "ubuntu-latest_7" failed.
build (macos-latest, 8)
The job was canceled because "ubuntu-latest_7" failed.
build (windows-latest, 17)
The job was canceled because "ubuntu-latest_7" failed.
build (macos-latest, 19)
The job was canceled because "ubuntu-latest_7" failed.
build (macos-latest, 17)
The job was canceled because "ubuntu-latest_7" failed.
build (ubuntu-latest, 8)
The job was canceled because "ubuntu-latest_7" failed.
build (ubuntu-latest, 19)
The job was canceled because "ubuntu-latest_7" failed.
build (windows-latest, 8)
The job was canceled because "ubuntu-latest_7" failed.
build (windows-latest, 8)
The operation was canceled.
build (windows-latest, 11)
The job was canceled because "ubuntu-latest_7" failed.
build (windows-latest, 11)
The operation was canceled.
build (macos-latest, 11)
The job was canceled because "ubuntu-latest_7" failed.
build (macos-latest, 11)
The operation was canceled.