Skip to content

Add tests

Add tests #190

Triggered via push January 16, 2024 06:47
Status Failure
Total duration 45s
Artifacts

ubuntu.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (head)
Process completed with exit code 1.
test (3.1)
The job was canceled because "head" failed.
test (3.1)
Process completed with exit code 1.
test (3)
The job was canceled because "head" failed.
test (3)
The operation was canceled.
test (2.7)
The job was canceled because "head" failed.
test (2.7)
The operation was canceled.