Skip to content

refactor(testing): migrate from enzyme, react 18 prep #662

refactor(testing): migrate from enzyme, react 18 prep

refactor(testing): migrate from enzyme, react 18 prep #662

Triggered via pull request July 14, 2023 20:31
Status Failure
Total duration 1m 4s
Artifacts

integration.yml

on: pull_request
Matrix: Integration-checks
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Integration-checks (18.x)
Process completed with exit code 1.
Integration-checks (20.x)
The job was canceled because "_18_x" failed.
Integration-checks (20.x)
The operation was canceled.